Why this matters more on whole-house projects
A whole-house remodel touches every interior wall, reconfigures the kitchen, and ties a new addition into the existing exterior walls. A 2-inch error in existing-conditions dimensions ripples through the entire design.
What gets drawn
- Floor plans of every level, rooms labeled and dimensioned.
- Exterior elevations — north, south, east, west — with window and door dimensions.
- Sections showing floor-to-ceiling heights, joist depth, and roof framing.
- Photo log indexed to the plans.
How it gets done
The designer or a measurement service spends a day with a laser distance meter. The CAD work takes another 1–2 weeks. Renton ramblers are generally more regular than pre-war Seattle bungalows, but walls still aren't square and floors still slope. A good measured drawing captures that — idealized horizontals produce drawings that the GC renegotiates during framing.
Where this information came from
- City of Renton CASSP Permit Portal · retrieved April 30, 2026
- Renton Municipal Code — Title 4 Development Regulations (Municode) · retrieved April 30, 2026
- Renton GIS Hub · retrieved April 30, 2026
- WA L&I — Verify a Contractor · retrieved April 30, 2026
- EPA — Renovation, Repair and Painting (RRP) Rule · retrieved April 30, 2026
- WAC 296-62-07703 — Asbestos definitions · retrieved April 30, 2026
- Energy Code | SBCC — Washington State Building Code Council · retrieved April 30, 2026
- City Electrical Permits & Inspections — WA L&I · retrieved April 30, 2026
- PSE | Building Project Steps and Applications · retrieved April 30, 2026